Service — 01

Kitchen Renovations in the Greater Toronto Area

A kitchen renovation in the Greater Toronto Area typically runs 4–8 weeks and covers cabinetry, countertops, flooring, lighting, and often a layout change. Blackstone General Contracting has remodelled GTA kitchens for over 20 years, from single-cabinet refreshes to full gut renovations with island additions and structural wall removal.

Kitchen Renovations project by Blackstone General Contracting in the GTA
Overview

We manage the whole project under one roof: design and material selection, demolition, licensed plumbing and electrical, cabinetry installation, countertop templating, tile, and final finishing. Because we are an authorized RONA+ contractor and an IKEA and KraftMaid installation partner, we can supply and install cabinetry across a wide range of budgets without you coordinating three separate trades.

Most GTA kitchens are renovated to open up sightlines to living space, add counter and storage capacity, and modernize finishes for resale. We flag load-bearing walls early, bring in a structural engineer when a wall needs to come out, and sequence the work so your home stays livable as long as possible.

What's included

  • Custom and semi-custom cabinetry (KraftMaid, IKEA, and local millwork)
  • Quartz, granite, and Cambria® countertop supply and installation
  • Kitchen islands, peninsulas, and pantry build-outs
  • Backsplash and full-height tile
  • Licensed electrical: pot lights, under-cabinet lighting, dedicated circuits
  • Licensed plumbing: sink relocation, dishwasher and fridge lines
  • Flooring: hardwood, engineered, luxury vinyl, and porcelain tile
  • Load-bearing wall removal with engineered beam (where required)

Typical GTA cost · 2026

$30,000 – $75,000+

A mid-range GTA kitchen refresh with new cabinetry, quartz counters, and flooring commonly lands between $30K and $50K. Full gut renovations with an island and wall removal run higher. Minor cabinet-and-counter updates can start near $15K.

Get a fixed quote
Why Blackstone

One contractor, every trade

Cabinetry, counters, electrical, plumbing, and tile are scheduled and warrantied by us — not stitched together across vendors you have to chase.

Retail cabinetry partnerships

Authorized installation partner for IKEA and KraftMaid, so your cabinet budget stretches without sacrificing a clean, professional install.

Livable-through-construction sequencing

We stage demolition and rough-ins to keep your kitchen usable as long as possible and protect the rest of the home from dust.

How we work

From first visit to final walk-through.

01

Consultation & scope

We visit the space, listen to what you want, and turn it into a clear scope and honest budget range — no vague ballparks.

02

Design & fixed quote

Material selections, drawings where needed, and a detailed fixed quote so you know exactly what you're paying for.

03

Permits & scheduling

We handle permit applications, structural engineering, and trade scheduling before a tool touches the site.

04

Build & finish

Licensed trades, tidy job sites, and staged work that keeps your home or business usable — finished on the timeline we set.

05

Walk-through & guarantee

A final walk-through, a punch list closed out, and a 12-month workmanship guarantee in writing.

Questions

Kitchen Renovations, answered.

Most GTA kitchen renovations take 4–8 weeks from demolition to final finishing. Cabinetry lead times and permit timelines for structural or electrical work are the two factors that most often extend a schedule.

Start here

Let's build something that lasts.

Tell us about your project. We'll visit the space, scope it honestly, and give you a fixed quote — no vague ballparks.